Undergraduate Academic Research Journal

Abstract

Soil protection works have become popular due to their immense contribution to protecting the building from land sliding. A building structure requires a stable foundation to ensure best construction and durability. There are various engineering techniques in soil protection works, this paper consists of the Soil nailing procedure adopted in the Northwest Commercial multi-use (NWCM) Project of Karle Infra Pvt. Ltd Company, currently executed by the vendor Geoengineering Pvt. Ltd. Soil nailing technique is used to stabilize the existing slope and construct retaining walls from top down. Steel nails are used as a reinforcement of soil which are drilled and grouted into the soil to create a compound mass similar to a gravity wall. The Soil nailing procedure is an alleviative measure to handle unstable natural soil slopes or unstable filled slopes. Soil protection works include multiple activities that occur in a systematic and sequential manner. The critical activities influencing the duration, schedule and progress of soil protection works are identified and a time-motion study is used as a tool to identify the difference in productivity to improve the progress of the soil protection work. Each activity of grouted nailing for one lift of excavation is carefully analyzed to record the time spent for that activity and to identify areas to reduce time and increase efficiency. The study can improve planning work based on the actual duration of activities identified and help to minimize delays at the construction site.

DOI

10.47893/UARJ.2022.1031

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.